Wednesday, October 17, 2012

Buses replace trains north of Harvard on weekends this fall

This fall the MBTA is set to close Porter, Davis, and Alewife stations on four separate weekends in order to finish necessary track and tunnel maintenance.

The T will close the three stations north of Harvard and replace train service with shuttle buses on the weekends of Nov. 17-18; Nov. 24-25; Dec. 1-2; and December 8-9.

The closures are part of a continuing multi-year project which started in November of last year. The first phase of the project caused the Red Line north of Harvard to be closed on weekends for four months. Although this time around the closures are not as extensive, the same type of work will be taking place.

 The MBTA plans on replacing corroded and damaged sections of trackage, concrete slabs, electrical wiring, and third rail as well as plugging tunnel cracks and sealing water leaks.

The Harvard to Alewife extension, which opened in 1985, has a specialized track that runs along thousands of concrete slabs instead of wooden ties. These slabs float on rubber disks, almost resembling hockey pucks, that help to cushion the trains vibrations. Over the years tunnel leaks have caused these slabs to crack and their rubber disks to corrode, which poses the risk of rail movement.

This necessary maintenance, which is set to cost around $34 Million, will be funded out of the MBTA's Capital Improvement budget. The T also received a little over $4.3 million in stimulus money to help off set the cost of the project. Here is the funding request. 

The reason for the closures is that the project cannot be managed solely within the 3 ½-hour window each morning when the T is closed, without disrupting service. Materials must be hauled in and out each weekend on special trucks outfitted to drive on rails, with the nearest entry point at the mouth of the tunnel near Kendall Station two miles from Harvard and nearly five miles from Alewife. 

Sunday, October 14, 2012

MBCR to hold TRAIN-Sylvania Blood Drive

For the second straight year, the Massachusetts Bay Commuter Railroad Company (MBCR), the company which operates the Commuter Rail for the MBTA, will be holding a halloween themed blood drive.

The drive which has been dubbed the "TRAIN-Sylvania" blood drive is going to be held at North Station on Wednesday, October 24th from 10:00am - 1:00pm.

All blood donated at the event will benefit patients at Brigham and Women's Hospital and the Dana-Farber Cancer Institute.

The MBCR will have a Halloween themed train, located on Track 1 at North Station, for the duration of the event. They will also be handing out Halloween long-sleeve shirts to anyone who donates.


Anyone looking to donate is recommended to make an appointment for the event. To make an appointment contact Sherry Rosen of the MBCR at (617)-222-8127 or sherry.rosen@MBCR.net. For information on eligibility to donate feel free to contact the Blood Donor Program at Partners Healthcare at (617)-632-2568 or blooddonor@partners.org.

Tuesday, October 9, 2012

MBTA Green Line train derails at Brigham Circle

All photos courtesy of Scott Page
Human error has been detrermined to be the cause of an MBTA green line derailment at Brigham Circle.

Yesterday at around 4:00 pm, MBTA Type-7 LRV #3633 derailed at the crossover at Brigham Circle station.

#3633 struck it's sister car Type-7 LRV #3634 which was sitting on the opposite track. The trains sustained minor damage during the accident. #3633 has some minor body damage (missing panels) and also sustained damage to it's center truck and articulation. #3634 also had some minor body damage. Also during the derailment, a light pole was bent over and a catenary wire bracket was broken off the line.

Most news outlets here in Boston are reporting only one form of human error was to blame in this situation. I believe, however, that there are three different ways people are at fault.

1: The Inspector at Brigham Circle Station

     -When Green Line trains terminate at Brigham Circle (which is all weekends and sometimes during the week) the inspector at Brigham must switch over the tracks so the trains can cross over and switch back outbound and return to the central subway. Today that did not happen. The inspector at the station failed to switch the track back over and subsequently the train derailed, thankfully only causing minor damage and not many injuries. I must however give the inspector a break. An MBTA press release stated that the inspector is an 18-year veteran of the MBTA who has had no prior major incidents.

2: The operator of #3633
   
     -Every operator that is trained to drive a trolley on the Green Line is taught to read their rail (make sure the switch they will be passing over is in the right direction) at every crossing and switch throughout the system. This however was not done today. If the operator had been paying attention to the rail in front of them, they would have noticed that the switch was not set properly and the accident would have been prevented.

3: The Administration/Inspector
   
     -According to the MBTA website, the schedule for the Green Line 'E' branch on Columbus day was the same as a Saturday schedule. The only exception was that trains would terminate at Heath Street instead of Brigham Circle like a regular weekend. Today that did not happen. If 'E' line trains were terminating at Heath St. this incident would have been avoided all together. This can however be blamed on a headway adjustment, meaning that the inspector at Brigham stopped the train before Heath because there were not enough Lechmere trains in the central subway (Which is done on a regular basis during the week).

Overall, this accident was not the fault of just one person and hopefully it was a learning experience for everyone involved.

After the incident, it took MBTA personnel six hours to get the trolley back on the tracks. #3633 and #3634 were then moved to an MBTA maintenance facility for evaluation and repair.

Related Posts Plugin for WordPress, Blogger...